Questions and Answers :
Bugs :
Tasks Exceeding Time Limits
Message board moderation
| Author | Message |
|---|---|
|
Send message Joined: 13 May 22 Posts: 49 Credit: 4,249,418 RAC: 2,533 |
I have recently been getting a lot of tasks that just don't stop until they time out or get an Exceeded Elapsed Time Limit error If I find one now I abort it. They waste huge amounts of cpu time, they take up a full core, they fail eventually anyway. I have reset the project on all my computers but it is still happening. They reach 100% and then keep running and can run up to 10 hours before the time limit steps in, the work units should be taking less than 4 hours. Please can this be looked into and fixed? It is annoying and makes me think about dropping this project. Thanks Conan |
|
Send message Joined: 23 Feb 25 Posts: 10 Credit: 16,606,890 RAC: 5 |
Me to, I think more then 50% of the tasks are at around 4 hours of running at 100% (like normal for my system) but then stays in the running state up to 24+ hours. Sometimes they eventually complete (ready to report) but more often they fail (computation error). For example: https://boinc.loda-lang.org/loda/result.php?resultid=15833330 wu_1753764465_4911_0 (completed) and https://boinc.loda-lang.org/loda/result.php?resultid=15823109 wu_1753764465_93_0 (timeout) But there are at least dozens more of each. |
|
Send message Joined: 22 Mar 25 Posts: 2 Credit: 2,194,929 RAC: 4,395 |
Same here. I am suspending the Project until this is fixed and aborting all current tasks that exhibit this behavior. I have better things for my computer's time. |
|
Send message Joined: 9 May 22 Posts: 312 Credit: 518,981 RAC: 0 |
We are looking into the problem |
|
Send message Joined: 9 May 22 Posts: 312 Credit: 518,981 RAC: 0 |
We found and fixed the issue. The fix is included in the new app version is 250804. Thanks for reporting it. |
|
Send message Joined: 10 Sep 22 Posts: 15 Credit: 891,093 RAC: 930 |
The last week or so I've been getting the "exceeded elapsed time limit" on tasks. I have aborted some tasks and then reset the project to see if if that helps but no I'm still getting the error. This is on two Windows machines running 10 & 11, using the 251201 version of the app. Links to some tasks that have the error but were returned before exceeding the deadline date: https://boinc.loda-lang.org/loda/result.php?resultid=17597374 https://boinc.loda-lang.org/loda/result.php?resultid=17575923 I have had three tasks complete successfully over the same period. Anyone else experiencing this or know of a possible solution? |
|
Send message Joined: 10 Sep 22 Posts: 15 Credit: 891,093 RAC: 930 |
Stopped receiving new work for a week, performed a project reset, then resumed work and all seems to be okay now. Hey ho! |
|
Send message Joined: 13 May 22 Posts: 32 Credit: 249,341 RAC: 313 |
I re-attach the project after some times. Same error. <message> |
|
Send message Joined: 10 Sep 22 Posts: 15 Credit: 891,093 RAC: 930 |
Looks like I've had nine tasks fail for exceeding the time limit, they hadn't, over the last two days. |
|
Send message Joined: 13 May 22 Posts: 32 Credit: 249,341 RAC: 313 |
Looks like I've had nine tasks fail for exceeding the time limit, they hadn't, over the last two days. 9 wus, 9 errors I stop the crunch |
|
Send message Joined: 13 May 22 Posts: 49 Credit: 4,249,418 RAC: 2,533 |
Still getting a number of these, have had another 15 today, <message> exceeded elapsed time limit 9585.79 (200000.00G/20.86G)</message> <stderr_txt> 2026-04-08 12:41:46 (800154): wrapper (8.3.26019): starting 2026-04-08 12:41:46 (800154): wrapper: running ../../projects/boinc.loda-lang.org_loda/loda-260314-linux-x86 (boinc -H 4) 2026-04-08 12:41:46 (800154): wrapper: created child process 800156 No idea why Conan |
©2026 LODA Language